Skip to content

BriefingA decision framework, not a measurement

Build, buy or license: a decision framework for a mid-size retailer

A household-flexibility product is six capabilities, not one. Decide per capability: what you must own, what you can rent, and which route fits a retailer of your size.

Peter Hofierka

Co-founder and CTO, Wattiva

5 min read

Last reviewed

  • Board

Key takeaways

  1. A household-flexibility product is six capabilities: device connectivity, forecasting, optimisation under customer limits, market access and settlement, a customer app, and back office and support.
  2. Much of the cost of building sits in maintenance, not the first release. Device integrations and settlement are the capabilities that keep costing after launch.
  3. Build when flexibility is core and you have the team; buy a large platform when you need breadth across many markets; license a platform sized for a mid-size retailer when you need a working product in your own market soon. Each is wrong for someone, Wattiva included.
  4. Put the same due-diligence questions to every vendor, and ask for definitions and evidence rather than slides.

Build, buy or license is not one decision. A household-flexibility product is six capabilities, and a retailer can own some and license others. Decide per capability, starting with the one whose failure would hurt you most. Then pick the route that covers the rest at the lowest risk to your customers and your trading position.

Six capabilities, and where building them stalls

1. Device connectivity across brands

Control runs through each manufacturer's cloud, for the car or the charger. Every brand has its own authorisation flow, rate limits, data quality and release schedule. The first integration is a project; many integrations are a standing team. Building stalls on maintenance: a manufacturer changes its interface, and every customer of that brand stops being controllable until someone fixes it. Decide who is on call for that before you decide anything else.

2. Forecasting

The engine needs to know when each device will be available and how much energy it needs, alongside prices and, where relevant, local solar. Plug-in and departure forecasts need history from your own customers, which you do not have until the product is live. Building stalls on that circularity. Early forecasts are weak, and a trading desk that sees weak forecasts early may stop trusting them.

3. Optimisation under customer constraints

Scheduling one car against a price curve is straightforward. Keeping every customer's promise across a portfolio is not: devices go offline, data arrives late, customers override, and the schedule must still meet each charge target by each departure time. Building stalls on the edge cases, and the edge cases are what customers remember.

4. Market access and settlement

Shifted load has to reach a market: through your own balancing group, through an aggregator role, or both. Metering data, baselines, schedules and the split of value between retailer and customer all have to reconcile every settlement period. Article 17 of Directive (EU) 2019/944 deals with demand response through aggregation, but how it works in practice is set nationally. Building stalls where trading, IT and regulation meet, because no single team owns the whole chain. Flexibility and the balancing group covers the trading side.

5. Customer app

Onboarding, device linking, consent, the limit the customer sets, a way to override it, and a clear view of the reward. Under your brand, or as functions behind your own app. The screens are the easy part. What stalls is the detail that decides whether customers leave the product switched on.

6. Back office and support

Rewards on the invoice, billing lines, and the support call that starts with "my car did not charge". Answering it needs the schedule, the device state and that night's prices in one place. It stalls because it is usually planned last, after customers are already calling.

None of this is beyond a capable retailer. The question is whether owning each capability is the best use of your engineers for every year it has to be maintained.

Three routes

Build, buy or license: when each route is right
Build in-houseBuy a large platformLicense a platform sized for mid-size retailers
What you getExactly what you specify, owned outrightBreadth: many device types, markets and modulesA working product for a defined scope, under your brand or behind your API
What you ownCode, data, team and all maintenanceYour configuration and data; the vendor owns the roadmapYour brand, customers and data; the vendor maintains engine and integrations
Right whenFlexibility is core strategy, you have a platform team, and you can wait for it to matureYou serve many markets or segments and can run a large integration programmeYou want a pilot in your own market soon and would rather spend engineering on your customer journey
Wrong whenYou need customers on it before the team is hiredLicence and integration are sized for a book much larger than yoursYou must own the IP, or your use case is outside the vendor's scope
Main riskMaintenance cost and key-person dependenceYou are a small customer of a large vendorVendor continuity and scope; test both in due diligence

Mixed routes are common and sensible. A retailer with a strong app team can keep its own customer journey and license the engine, device connections and settlement behind it through an API. A retailer that wants to own forecasting can still rent device connectivity, which is the capability that ages fastest.

When Wattiva is the wrong choice

We license a flexibility and energy-sharing platform to electricity retailers, under their brand or behind their API. It moves household load, EVs first, into cheap intervals inside limits each customer sets, and settles the result. We operate our own portfolio in Slovakia under a supply and independent-aggregation permit (ÚRSO permit no. 2026E 0945), and organise an energy-sharing group at the market operator's data centre (OKTE EDC). A pilot can be prepared within three weeks of meeting the agreed technical and contractual prerequisites. Operating a household portfolio in Slovakia describes what running it involves.

That makes us the wrong choice if you want to own the engine's IP; if your first use case is not electric cars; if your procurement requires a vendor size or track record that you find we do not meet; or if your market's rules do not yet support the route to market you need, which we assess country by country. Better to find that out in the first call than in the pilot.

Due-diligence questions for any vendor, us included

  1. Which device brands are controllable in production today, and which are on a roadmap? What happens to customers of a brand when its interface changes?
  2. How do you define and measure a kept promise, such as a charge target met by the departure time? How do you define and measure overrides?
  3. What is your forecast error for available flexibility, how is it measured, and over what period?
  4. Who holds balancing responsibility in each deployment model, and who carries the imbalance caused by a forecast miss?
  5. How is the value split between retailer and customer computed, and can our controller reproduce it from raw data?
  6. Which regulatory roles do you hold in which markets, and what would entering ours require?
  7. What do you operate yourselves, on your own customers, and not only for clients?
  8. Who owns customer and device data, how do we export it, and what protects our service if you are acquired or fail?
  9. Which security controls are in place today, and which certifications do you hold, with the report for each?
  10. What exactly happens in the pilot, what are its prerequisites, and what decides whether it scales?

Ask for definitions and evidence, not slides, and put the same list to us. Once you have decided, The first 90 days of a flexibility product covers what comes next.

NoteWhat this piece is

A decision framework, not a measurement. It gives no build costs, timelines or failure rates, because we do not have sourced figures that would hold across retailers. The only duration stated is our own pilot-preparation commitment.

Sources

  1. 1.Directive (EU) 2019/944 on common rules for the internal market for electricity, Article 17 — EUR-Lex
  2. 2.ÚRSO permit no. 2026E 0945

Next step

Put the questions to us

A dated pilot plan in two minutes, without a call.

Written by

Peter Hofierka

Co-founder and CTO, Wattiva

About Wattiva Energy Intelligence

Wattiva Energy Intelligence is our research series on demand-side flexibility at household level. It is built on public market data, with the method shown, and on what we learn operating our own portfolio in Slovakia.

Savings discussed in this series concern the commodity price. Network fees still apply.

All research